- Allow the plywood to sit for several days in the room in which will be installed
- Make sure the subfloor is dry and structuraly sound
- Install and secure with 1″ deck scews a sheet of plywood, smooth side facing upward
- Make sure the underlayment sems are not aligned with the subfloor seams
- Lay the following plywood sheet – start along the longest wall and leave 1/4″ expansion gaps in between sheets and between the sheets the walls
- Secure the plywood sheet every 6″ – make sure to drive the deck screw heads bellow the surface of the plywood sheet
- Cut the plywood shets as required to follow the surface of the floor
- Apply floor patching over the screw heads and the plywood seams
- After the patching compound has dried, sand the compound
- Vaccum and wipe with a damp cloth all the resulting dust
Purchase These Real Estate EBooks Now!
No comments:
Post a Comment